Categories

Testimonials

Fortis were fantastic from start to finish. They designed my front gate exactly as I asked them to and it was installed remarkably quickly. The end result is great and they were considerably cheaper than the other quotes I got! I would highly recommend Fortis for any Electric Gates.

Carl Murphy | Home Improvement Customer

Martin the Radiator job on PM2 went really well with no incidents, the lads were great and a credit to your business. All up and running now, everyone is happy. Adam has arranged to pick up your hired lifting tackle one day next week, let me know what day please. Thank all the lads personally for...

Pete Snell | Shotton Paper Mill

Martin, I just wanted to thank you and your lads for the service you provided to us on Davyhulme Wastewater Treatment Works. Fortis's reliability, quality of work and quick response times enabled a successful project on all fronts. I look forward to working with you again on the United Utilities sit...

Mark Fuller | Laing O'Rourke

Hi Martin No problem, will get on that soon as, thankyou for assisting us with the emergency repairs the other day, the lads were brilliant and very easy to deal with as per. Best Regards, Rhys

Rhys Williams | UPM Shotton Paper Mill

I just wanted to thank you and your team behind you for the way you conducted yourselves and the work that you have done for us in the last month. We are always apprehensive taking on new contractors as our clients are very important to us, but I can say that Fortis Engineering Services Ltd have...

James Couch | North West Construction UK Ltd
View All
Thames Water

Thames Water

Pipe Work Fabrication & On-site Installation

Ivor pumping station borehole pump replacement

The client Thames Water had 6 borehole pumps which where 35m deep into the ground pumping fresh water from the ground to be treated and then fed into the mains water feed for the whole of Slough. Our job was to remove the existing pumps one by one and the 35m of pipework attached to pumps and replace them with new 1m diameter scotch coated steel pipe work 35m in length and new upgraded pumps. We first removed top drive pump using the buildings overhead crane and unbolting flanges. We then lifted pipe work out a section at a time in a lifting sequence agreed with the client. We then made some alterations to the pipe work at the top of well where the new pumps where to be installed. The new pipe was then lifted into well again a section at a time until all 35m was in the well. We then lowered new pumps into position and bolted up. Pipe work was pressure tested before use and once passed pumps where run and tested. Project was completed on time and to budget.

Case Images